top of page

URA Technology Drive Parking Garage

This URA Pittsburgh Technology Center Garage III was constructed as a 6-story, 2-bay, 700-space parking garage.  The structural system is precast, prestressed concrete; the architecture includes precast spandrel panels, curtain wall glazing, and perforated metal screen elements; and on the top roof level, the building includes a full-coverage solar panel array.  PennStress produced 583 total precast/prestressed concrete members for the garage including architectural white and architectural gray colored concrete.

1.  URA PG.jpg

Project Photos

PENNSTRESS

Mail: PO Box 597 Hollidaysburg, PA 16648

Plant: 8180 Woodbury Pike Roaring Spring, PA 16673

814-695-2016

 

PennStress, a division of the MacInnis Group, LLC 

© 2024 by PennStress. All Rights Reserved. Managed by Cassus Media